Post  craig@STW Mon 18 Nov 2013, 9:19 pm

another long awaited update (sorry about that peeps, can't believe its been this long Embarassed )

first thing to show is another batch of completed boilers. the second lot done by our new welder...

general production update: november 2013 Hallow003-001_zpsa8ae2526

and as soon as the 6inch foden cylinders were done it was time to get on with the four inch ones.
after the front and rear faces are done everything else is done in one op on the 4th axis machine that lasts 1hour 20mins !!!

general production update: november 2013 Hallow004-001_zpsd332fc90

general production update: november 2013 Work1113001_zps1585ea68

and then the liners are shrunk in...

general production update: november 2013 Work1113003_zpsb091e4cc

this month we have also completed another full batch of water cart/bowsers. this goes out as one large complete kit...

general production update: november 2013 Hallow011-001_zps83e04aab

general production update: november 2013 Hallow012_zps38e5fc17

general production update: november 2013 Work1113009_zps83b2ecb2

general production update: november 2013 Work1113010_zps51eb5c03

general production update: november 2013 Work1113011_zps5fdf5152

general production update: november 2013 Work1113006_zps38036434

general production update: november 2013 Work1113005_zps5d677e5c

general production update: november 2013 Work1113018_zps7985da5a

general production update: november 2013 Work1113017-001_zpseddc4710
craig@STW
craig@STW

Number of posts : 1410
Location : location Location
Registration date : 2010-05-06

Back to top Go down

general production update: november 2013 Empty Re: general production update: november 2013

Post  craig@STW Mon 18 Nov 2013, 9:29 pm

we are also working on Kit2 of the new batch of showmans and kit one of the new single crank compound model.

hubs, covers rivets etc are all done...

general production update: november 2013 Work1113013_zps7d49d344

wheels rims are rolled...

general production update: november 2013 Work1113014_zpsd37cd077

and are now being welded up...

general production update: november 2013 Work1113016_zpsd5d3a9d7

and we just have the spokes to do on this and then its ready.

also been working on the showmans flywheels...

general production update: november 2013 Work1113023_zps3daa3549

also probably worth a mention is the small change to the way production is manged. general organization, material ordering and preparation used to be shared by about four different people. all this will now be done by Ian, through direct contact with Dean and Steve, allowing the rest of us to get on getting the bits made Cool 

more updates soon, but if i do forget. just shout Wink 
craig@STW
craig@STW

Number of posts : 1410
Location : location Location
Registration date : 2010-05-06

Back to top Go down

general production update: november 2013 Empty Re: general production update: november 2013

Post  HStannard Mon 18 Nov 2013, 9:31 pm

Anything for the 6" Fodens?? Question  Crying or Very sad 
HStannard
HStannard

Number of posts : 58
Location : Rushden, Northants
Registration date : 2011-11-09

Back to top Go down

general production update: november 2013 Empty Re: general production update: november 2013

Post  craig@STW Mon 18 Nov 2013, 9:33 pm

next kit for the 6inch fodens will be the horn-plates. just waiting on the laser cuts to arrive. most of the other material is already hear.
craig@STW
craig@STW

Number of posts : 1410
Location : location Location
Registration date : 2010-05-06

Back to top Go down

general production update: november 2013 Empty Re-general-production-update-november-2013

Post  sherwood-ranger Mon 18 Nov 2013, 10:04 pm

Hi Craig, what's the latest on the 2" boilers?
Thanks in advance.
sherwood-ranger
sherwood-ranger

Number of posts : 19
Age : 60
Location : witney
Registration date : 2012-03-13

Back to top Go down

general production update: november 2013 Empty Re: general production update: november 2013

Post  tractor mike Mon 18 Nov 2013, 10:32 pm

Hi Craig thanx for the update. All looking really good Very Happy 
tractor mike
tractor mike

Number of posts : 74
Age : 40
Location : taunton somerset
Registration date : 2012-01-29

Back to top Go down

general production update: november 2013 Empty Re: general production update: november 2013

Post  craig@STW Tue 19 Nov 2013, 5:32 pm

sherwood-ranger wrote:Hi Craig, what's the latest on the 2" boilers?
Thanks in advance.
apparently the 2inch boilers are nearly ready. just the final "tidying" to do Cool 
craig@STW
craig@STW

Number of posts : 1410
Location : location Location
Registration date : 2010-05-06

Back to top Go down

general production update: november 2013 Empty Re: general production update: november 2013

Post  augustrock Wed 20 Nov 2013, 11:09 am

Burrell 4" Agric.

It is a long time since we had Kit 19. When is Kit 20 due. I see no mention of it in your forecast of production.

It is very cold in the workshop with nothing to do!

Peter.

augustrock

Number of posts : 29
Location : Andover Hampshire
Registration date : 2008-06-19

Back to top Go down

general production update: november 2013 Empty Re: general production update: november 2013

Post  busman Wed 20 Nov 2013, 8:35 pm

Kit 20 plus the elusive flywheel!!:

busman

Number of posts : 27
Location : Herne Bay Kent
Registration date : 2011-08-02

Back to top Go down

general production update: november 2013 Empty Re: general production update: november 2013

Post  craig@STW Thu 21 Nov 2013, 10:41 am

the next 4inch agric kit will be kit 22. not kit 20. kit 22 is gear change, water gauge and whistle parts and should go out by the end of the month.
craig@STW
craig@STW

Number of posts : 1410
Location : location Location
Registration date : 2010-05-06

Back to top Go down

general production update: november 2013 Empty Re: general production update: november 2013

Post  craig@STW Sun 24 Nov 2013, 4:48 pm

a few more pics of this weeks work...

the water cart is just waiting for the seat pads to arrive...

general production update: november 2013 Work2411002-001_zps0351912c

the SCC wheels being welded and drilled...

general production update: november 2013 Work2411017-001_zps99267a62

general production update: november 2013 Work2411005-001_zps376272ee

general production update: november 2013 Work2411004-001_zps2c7a20a7

and the spokes are here...

general production update: november 2013 Work2411009-001_zps8ff5d48e

general production update: november 2013 Work2411008-001_zpsfa0a79d2

and the completed wheel...

general production update: november 2013 Work2411016_zps7cd39bce

loads of laser cuts arrived this week. apart from the SCC spokes, most of them are for the next 6inch foden kit.

general production update: november 2013 Work2411015-001_zpsf460d033

the horn plates are ready to go onto the CNC for drilling...

general production update: november 2013 Work2411006_zps934ec858

and I've stared work on the support brackets...

general production update: november 2013 Work2411012-001_zps8c6c81fe


not sure if i'll get an update done next weekend cos im moving house. but if there's anything extra special to see i'll get a photo Cool 

craig@STW
craig@STW

Number of posts : 1410
Location : location Location
Registration date : 2010-05-06

Back to top Go down

general production update: november 2013 Empty Re: general production update: november 2013

Post  Sponsored content


Sponsored content


Back to top Go down

Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum