Post  craig@STW Wed 03 Jul 2013, 9:07 pm

OK, as promised a quick look at whats happening this week.
 
firstly the boilers. the next batch of 10 burrell 4inch boilers are now at the stage of being tacked together, with four currently looking like boilers but awaiting final welding and the rest in various stages of construction...
 
general production update JULY 2013 Work707001_zps65198fe1
 
general production update JULY 2013 Work707002_zps5e6cc836
 
general production update JULY 2013 Work707004_zpsd6de4ff8
 
Just to confirm that the 2inch Burrell kit 7 for the "running behind" people will be leaving tomorrow (Thursday 4th)
 
the machine shop is currently working on the next 4inch Burrell kit. this is the main gears and diff.
 
1st gear turned and drilled...
 
general production update JULY 2013 Work707012_zps2886a336
 
and ready for gear cutting...
 
general production update JULY 2013 Work707013_zpsa8cd819d
 
and the "compensating center" castings are next on the machine...
 
general production update JULY 2013 Work707014_zps89bc6517
 
the smoke boxes for the next 6inch foden kit have been rolled...
 
general production update JULY 2013 Work707006_zps1690f510
 
allowing the machine shop to start work on the chimney base castings...
 
general production update JULY 2013 Work707007_zps39874fe9
 
general production update JULY 2013 Work707011_zps231539c4
 
and the cylinder block castings are in the factory...
 
general production update JULY 2013 Banbury002_zps26411f8d
 
the wood for the next traction wagon kit arrived today...
 
general production update JULY 2013 Work707019_zpsf5c66f78
 
and i've started work on the only milled part in that kit... the tow bracket...
 
general production update JULY 2013 Work707023_zps17f65b26
 
lots of different kits happening all at once but for now the burrell 4inch gear kit is our priority, i'll keep you updated if/when this changes or not Cool


Last edited by craig@STW on Mon 08 Jul 2013, 3:58 pm; edited 1 time in total (Reason for editing : Bu2 kit 7 not kit 17)
craig@STW
craig@STW

Number of posts : 1410
Location : location Location
Registration date : 2010-05-06

Back to top Go down

general production update JULY 2013 Empty Re: general production update JULY 2013

Post  craig@STW Mon 15 Jul 2013, 9:35 pm

A quick look at last weeks work Cool ...

the last traction wagon kit is all done. mostly bought in wood and loads of manual hinges...

general production update JULY 2013 Ebay004_zpsb4e81290

general production update JULY 2013 Ebay005_zps1cab8f66

and the control model going together...

general production update JULY 2013 Ebay070_zpsf86609fa

nearly done on the 4 inch Burrell diff and gears kit...

general production update JULY 2013 Ebay066_zps4e5f9c20

general production update JULY 2013 Ebay057_zps60ff1a33

general production update JULY 2013 Ebay008_zpsb2435e50

general production update JULY 2013 Ebay065_zpsfca64c73

just one more op to do on the main compensating centers....

general production update JULY 2013 Ebay062_zpsa25b2844

still doing every thing we can on the 6 inch Foden smoke-box kit, although we are waiting for some castings to arrive...

general production update JULY 2013 Ebay054_zpsc698739b

chimney bases done...

general production update JULY 2013 Ebay063_zps38af97ea

dart and dart bar...

general production update JULY 2013 Ebay060_zps015161e2

hinge...

general production update JULY 2013 Ebay052_zps2de040a4

and "tow-bar saddle"

general production update JULY 2013 Ebay048_zpsd22cda2e

next 4inch Foden kit is the water tanks, just waiting for the laser cut parts to arrive and then the next kit will be the smoke box and I've just sorted out the material order for this one and actually started on a few parts that we have material in stock for.

next 2 inch Burrell kit will be the diff and main gears, I'll get an up date on this for next week.
craig@STW
craig@STW

Number of posts : 1410
Location : location Location
Registration date : 2010-05-06

Back to top Go down

general production update JULY 2013 Empty Re: general production update JULY 2013

Post  Hecter Sun 21 Jul 2013, 1:52 pm

Are the two kits that should be arriving this month for the 4.5" foden on schedule?

Hecter

Number of posts : 50
Age : 30
Location : Luton
Registration date : 2013-02-13

Back to top Go down

general production update JULY 2013 Empty Re: general production update JULY 2013

Post  craig@STW Sun 28 Jul 2013, 9:34 pm

OK, quick up date before we get to "next week".

the two foden 4inch kits are being worked on but are still behind schedule. the main problem is the bottle neck on the lathes as all the kits at the moment seem to be based on turned parts. the water tank laser cuts are in and they are being formed to shape but are waiting for the bushes to be turned and the material for the smoke box kit has started arriving.

most of this weeks work has been on the 6inch foden, the smoke boxes have taken a lot of work but are coming on well...

general production update JULY 2013 Eeb008008_zps290c9919

the tow brackets are done...

general production update JULY 2013 Trop002_zps79d27df3

and dart Assembly...

general production update JULY 2013 Trop005_zpsce3a5e5b

hinge blocks...

general production update JULY 2013 Eeb008010_zps1339aacc

and the chimney bases...

general production update JULY 2013 Trop006_zps8aa9f3c7

the milling section has been doing the final ops on the turned items and is now working on some items for future 2inch burrell kits.
craig@STW
craig@STW

Number of posts : 1410
Location : location Location
Registration date : 2010-05-06

Back to top Go down

general production update JULY 2013 Empty 6"foden

Post  hippy dave Tue 30 Jul 2013, 5:09 pm

Bits looking mighty fine for 6" Foden any ideas when we might be getting them,cheers:D 
hippy dave
hippy dave

Number of posts : 188
Location : bognor regis
Registration date : 2011-07-31

Back to top Go down

general production update JULY 2013 Empty Re: general production update JULY 2013

Post  craig@STW Tue 30 Jul 2013, 6:55 pm

just have the doors to do now (although they wont be quick) and waiting for the chimney caps to arrive. will be as soon as we can, obviously it's just as important to us to get the kits out the door. maybe another week ??

also now working on (and pushing hard) the parts for the 4inch foden water tank kit. again could be within a week.

will let you know Cool 
craig@STW
craig@STW

Number of posts : 1410
Location : location Location
Registration date : 2010-05-06

Back to top Go down

general production update JULY 2013 Empty Re: general production update JULY 2013

Post  craig@STW Sat 03 Aug 2013, 10:47 am

quick update...

got the 4inch foden water tank kit done, they just need packing and then they can go out...

general production update JULY 2013 Work001_zps404efb9d

general production update JULY 2013 Work003_zps377f0e57

general production update JULY 2013 Work002_zpsed16570c

the first of the 6inch foden smoke-box doors is done and the kit has gone together fine. gonna take a few days to machine the rest and i think we are waiting for one laser cut to arrive, so this could be going out next week...

general production update JULY 2013 Work005_zps5ecbda99

and mark has started work on the 6inch foden cylinder blocks, but don't get exited just yet as it always takes a while to sort out the machining ops and jigs etc.

general production update JULY 2013 Work013_zpsee2c2918

im off on holiday next week but will try to get an update when i get back the following Monday (12th) Cool 

craig@STW
craig@STW

Number of posts : 1410
Location : location Location
Registration date : 2010-05-06

Back to top Go down

general production update JULY 2013 Empty Re: general production update JULY 2013

Post  burrell1 Sat 03 Aug 2013, 1:34 pm

Craig

The smoke box and chimney for the 6" Foden really do look great and I expect they are larger than the picture shows. Thank you for the advanced pictures of the start of the cylinder block milling. I expect that these are going to be very heavy. If I get the chance I may come and collect mine when they are ready. I hope that you have a good holiday.

Bill

burrell1

Number of posts : 156
Location : Clacton, Essex
Registration date : 2008-06-19

Back to top Go down

general production update JULY 2013 Empty Re: general production update JULY 2013

Post  hippy dave Sat 03 Aug 2013, 6:49 pm

looking good cheers craig
hippy dave
hippy dave

Number of posts : 188
Location : bognor regis
Registration date : 2011-07-31

Back to top Go down

general production update JULY 2013 Empty Re: general production update JULY 2013

Post  Sponsored content


Sponsored content


Back to top Go down

Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum