Post  craig@STW Mon 09 Sep 2013, 6:05 pm

OK, the long awaited next up date. with Mark spending most of his time on the 6inch Foden cylinders I've been trying to do as much as i can with the other machines and to be honest i just keep forgetting to stop and take photos.

but here's the state of play at the moment...

first off, the Burrell 4inch boilers were inspected/tested last Friday and the final bit of work was done today. so we have some that are ready to go and work is already underway on the next ones...

General Production update SEPTEMBER 2013 Worksept00002_zpse9c02a89

General Production update SEPTEMBER 2013 Worksept00007_zps6c0707dd

The last part of the Showmans went out last month, the meter board...

General Production update SEPTEMBER 2013 Worksept00001_zps29006e5f

work is going well on the foden 6inch cylinders. i think we are on op 3 or 4 now. the main bores are done and there are no problems to report so far Cool ...

General Production update SEPTEMBER 2013 Worksept00010_zps1fba64f4

and the rest of the machines have been busy on the 4inch Burrell final drive/ gear guards kit.

lots of turning in this kit...

General Production update SEPTEMBER 2013 Worksept00005_zps91465882

General Production update SEPTEMBER 2013 Worksept00011_zpsd8f0262b

and gear cutting...

General Production update SEPTEMBER 2013 Worksept00004_zpsc2540e27

with a little bit of work on the mills...

General Production update SEPTEMBER 2013 Worksept00006_zpsbfb5cb66

we finally got this kit together today and it will be going out tomorrow...

General Production update SEPTEMBER 2013 Worksept00012_zps18df2c0b

General Production update SEPTEMBER 2013 Worksept00009_zps79be0bbc

next kit to concentrate on is the foden 4inch smoke box kit. again this is being held up on the turning side with a fair bit of the milling already done....

General Production update SEPTEMBER 2013 Worksept00003_zps24df5687

also working on a lot of Burrell 2inch parts.
craig@STW
craig@STW

Number of posts : 1410
Location : location Location
Registration date : 2010-05-06

Back to top Go down

General Production update SEPTEMBER 2013 Empty Re: General Production update SEPTEMBER 2013

Post  hippy dave Mon 09 Sep 2013, 8:19 pm

lots going on any idea on when cylinder block will be finished cheers dean:D 
hippy dave
hippy dave

Number of posts : 188
Location : bognor regis
Registration date : 2011-07-31

Back to top Go down

General Production update SEPTEMBER 2013 Empty Re: General Production update SEPTEMBER 2013

Post  craig@STW Mon 09 Sep 2013, 8:53 pm

i'll see what mark thinks, but i'm guessing it's gonna be weeks rather than days Shocked 
craig@STW
craig@STW

Number of posts : 1410
Location : location Location
Registration date : 2010-05-06

Back to top Go down

General Production update SEPTEMBER 2013 Empty Re: General Production update SEPTEMBER 2013

Post  lynnr Mon 09 Sep 2013, 9:30 pm

Unless my eyes are tricking me. There is 2 different boiler designs in the photo.
lynnr
lynnr

Number of posts : 3242
Age : 56
Location : Highland, 4inch showman
Registration date : 2010-08-06

Back to top Go down

General Production update SEPTEMBER 2013 Empty Re: General Production update SEPTEMBER 2013

Post  Kevster Mon 09 Sep 2013, 9:57 pm

Any news on the 4" DCC flywheels please?

Thanks

Kev
Kevster
Kevster

Number of posts : 424
Location : Hertfordshire 4 inch; DCC road loco
Registration date : 2011-01-27

Back to top Go down

General Production update SEPTEMBER 2013 Empty Re: General Production update SEPTEMBER 2013

Post  craig@STW Wed 25 Sep 2013, 5:59 pm

OK, the next update is here cheers 

first off, the DCC flywheels are in the building. we will get them out as soon as possible.

work is progressing well on the 6inch foden cylinders. Mark is working his way around the side faces. apparently there are a lot of cross holes to drill so still a bit to do yet...

General Production update SEPTEMBER 2013 Workseptb00001_zpsb398df04

General Production update SEPTEMBER 2013 Workseptb00002_zpsca24f740

General Production update SEPTEMBER 2013 Workseptb00003_zps06b8fb07

good news is that we are nearly there with the 4inch foden smoke box. again this has been another kit with a lot of turning in it so the bottle neck is still there. we are aiming to get this out next monday/tuesday.

first op on the smoke-box...

General Production update SEPTEMBER 2013 Workseptb00004_zps45b67753

and the finished item...

General Production update SEPTEMBER 2013 Workseptb00005_zps82d88114

the smoke-box ring...

General Production update SEPTEMBER 2013 Workseptb00006_zps4ed6b374

General Production update SEPTEMBER 2013 Workseptb00007_zps3f7d0321

now ready for milling...

General Production update SEPTEMBER 2013 Workseptb00008_zps3cf6d476

chimney base...

General Production update SEPTEMBER 2013 Workseptb00009_zpscce5256d

General Production update SEPTEMBER 2013 Workseptb00010_zps336dc64a

we are constantly checking the fit of the parts...

General Production update SEPTEMBER 2013 Workseptb00011_zps5984fffb

chimneys...

General Production update SEPTEMBER 2013 Workseptb00012_zpsbee0656e

and again i have been filling the time with 2inch burrell parts and weld prep on boiler plates.

2inch winding drums...

General Production update SEPTEMBER 2013 Workseptb00014_zpsa00c1cfe

2inch copper boiler parts...

General Production update SEPTEMBER 2013 Workseptb00013_zps5e95ae39
craig@STW
craig@STW

Number of posts : 1410
Location : location Location
Registration date : 2010-05-06

Back to top Go down

General Production update SEPTEMBER 2013 Empty Re: General Production update SEPTEMBER 2013

Post  craig@STW Wed 25 Sep 2013, 6:03 pm

Oh yes, the other boilers in the photos from last time are 4inch foden.

the new welder, Harry, was given a small batch to start with. just to make sure everything went smoothly. he is already working on the next batch with the long term plan that he produces boilers full time on a continuous loop Cool 
craig@STW
craig@STW

Number of posts : 1410
Location : location Location
Registration date : 2010-05-06

Back to top Go down

General Production update SEPTEMBER 2013 Empty Re: General Production update SEPTEMBER 2013

Post  Hecter Thu 26 Sep 2013, 7:23 pm

Any news on the other kits we're waiting on for the 4" foden?

Hecter

Number of posts : 50
Age : 30
Location : Luton
Registration date : 2013-02-13

Back to top Go down

General Production update SEPTEMBER 2013 Empty Re: General Production update SEPTEMBER 2013

Post  craig@STW Thu 26 Sep 2013, 8:50 pm

not 100% sure on what your waiting for Embarassed 

the cylinder block castings are in and will be started as soon as possible, that's all i know
craig@STW
craig@STW

Number of posts : 1410
Location : location Location
Registration date : 2010-05-06

Back to top Go down

General Production update SEPTEMBER 2013 Empty Re: General Production update SEPTEMBER 2013

Post  SSGR Thu 26 Sep 2013, 9:21 pm

Thanks for the update Craig.

John
SSGR
SSGR

Number of posts : 88
Age : 59
Location : North Yorkshire
Registration date : 2012-05-14

Back to top Go down

General Production update SEPTEMBER 2013 Empty Re: General Production update SEPTEMBER 2013

Post  Sponsored content


Sponsored content


Back to top Go down

Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum