Started Value Issue
2 posters
Page 1 of 1
Started Value Issue
Hello All,
Having put the starting value together (Kit 27), I noticed an issue when connecting it to the cylinder. The holder for the ball bearing is much wider than its intended hole in the cylinder block. Therefore, do I make the hole in the cylinder block bigger, or do I reduce the length of the holder (as it is longer than the starter value cylinder).
Did anyone else have this issue and if so, how was it resolved?
Thanks in advanced.
Brian M
Having put the starting value together (Kit 27), I noticed an issue when connecting it to the cylinder. The holder for the ball bearing is much wider than its intended hole in the cylinder block. Therefore, do I make the hole in the cylinder block bigger, or do I reduce the length of the holder (as it is longer than the starter value cylinder).
Did anyone else have this issue and if so, how was it resolved?
Thanks in advanced.
Brian M
Brian M- Number of posts : 261
Location : Cheshire
Registration date : 2011-01-30
Re: Started Value Issue
There should have been a note in the insructions to drill out the hole in the block to 6mm instead of the 4mm it was drilled by STW. If I am remebering this wrong I'm sure someone will correct me. Its a very easy drill out just watch the components on the slide bar.
Re: Started Value Issue
Cheers Kev
Brian M- Number of posts : 261
Location : Cheshire
Registration date : 2011-01-30
Page 1 of 1
Permissions in this forum:
You cannot reply to topics in this forum