Post  craig@STW Fri 12 Jul 2019, 4:13 pm

this weeks photos. just to put aside any fears that the lyka has been forgotten lately, i did post some photos of the wooden seat backs a few weeks ago. these are now with the upholsterer along with the seat bases. we also have a subcontractor working on the other wood for the seats, the same people that do all our wagon wood these days so that kit is being worked on...

July, August, September 2019 production photos. IH8TBzU

the boiler cladding kit is being done, however it takes time to get the laser cut parts done and as tweaks are still being made to the design its taking longer than expected...

July, August, September 2019 production photos. KevmLp4

all the fittings for this kit are on the shelf...

July, August, September 2019 production photos. 1ZA5C1y

the showmans dynamo kit has finally gone. there were many reasons for its delay, the details we need not go into, its done now, we can only apologize for the delay  Embarassed

our big machine is free this week so i have taken the opportunity to get started on these 6inch foden front axle castings. these have been sitting around for a few months now...

July, August, September 2019 production photos. QcjgqFa

the big machine is not just big in size, its big in power and is needed to blast out the large hole for the axle shaft...

July, August, September 2019 production photos. YQGGCTp

from large to small and 2inch kit 10 bearing housing caps...

July, August, September 2019 production photos. PYvb6uf

and making a start on 2nd shaft tubes. these are turned from solid bar on the 2inch...

July, August, September 2019 production photos. GHHE7bB

i have also finished off the small batch of 4inch burrell smoke box door rings. these are used on the standard BU and the SCC

July, August, September 2019 production photos. 1pilzea

and the vast majority of parts are already packed this week. this is most of the roller kit 21...

July, August, September 2019 production photos. NI3HXPn

July, August, September 2019 production photos. IdGoTE6

and the BU and SCC kit 8...

July, August, September 2019 production photos. NaprS9s
craig@STW
craig@STW

Number of posts : 1410
Location : location Location
Registration date : 2010-05-06

Back to top Go down

July, August, September 2019 production photos. Empty Re: July, August, September 2019 production photos.

Post  Will@STW Thu 18 Jul 2019, 2:57 pm

Hi guys

A quick update for the Lykamobile customers. As has been pointed out some of you have been concerned by the lack of progress on kit 18 lately, this is completely understandable, and hopefully we can address this issue now. Please be assured that the work on the lykamobile hasn't actually stopped, it has just slowed down as we have been waiting for our suppliers to come up with the prototyping. As I'm sure you will all understand, Steve had a lot of the knowledge about the lykamobile in his head, as a result I have been staring at a screen for a number of months trying to get my head around the lykamobile, and understand what Steves plans were, and with Ian's help, it is starting to come together, the design is once again getting ahead again, and we have a rough plan for the rest of the kits. However, due to the amount of knowledge lost with Steve, we are slightly weary about ordering an entire batch of laser cuts without knowing that they are definitely correct. So I'm afraid we have been waiting for the laser cutters to do a batch of one off laser cuts, which they hate doing. This is why progress has been rather slow of late, as we have waited three weeks for one batch of laser cuts before then folding and welding them. Despite this progress has now been made. The prototype burner tray and cladding and smokehood has been finalized and the batch has been placed on order. The burner tray is the biggest issue, as they are made of a lot of separate parts. To show you what I mean, here are a few pictures of the burner tray prototype.

July, August, September 2019 production photos. 114

July, August, September 2019 production photos. 213

July, August, September 2019 production photos. 313

Hopefully this will be the last of the difficult kits to do as the rest is pipework and fittings. In the meantime as Craig has said, the seats are away being upholstered, and the seat spindles and hand rails are in production at our wood suppliers. So the 2 kits are now in a race against each other, and the first to finish will be the first to be sent out, and in the meantime our manual workers will be thinking of ways to do me in as they get to grips with the pipework (we hate the pipework) Laughing Laughing Laughing

Hopefully this will all be sorted soon

Thank you all for your patience

Will@STW
Will@STW
Will@STW

Number of posts : 196
Age : 27
Location : Daventry
Registration date : 2019-01-29

Back to top Go down

July, August, September 2019 production photos. Empty Re: July, August, September 2019 production photos.

Post  craig@STW Fri 19 Jul 2019, 3:54 pm

busy setting machines this afternoon. this weeks photos will be up in the morning Cool
craig@STW
craig@STW

Number of posts : 1410
Location : location Location
Registration date : 2010-05-06

Back to top Go down

July, August, September 2019 production photos. Empty Re: July, August, September 2019 production photos.

Post  craig@STW Sat 20 Jul 2019, 9:23 am

this weeks photos. i've been in the machine shop on my own this week, Mark has been on holiday and as a rule he tends to set up 99% of the turned jobs. i can do it, but im a bit slower than he is Laughing Laughing

we are making progress on the next 2inch kit with the 2nd shaft tubes on their last op...

July, August, September 2019 production photos. 1Jzj31F

July, August, September 2019 production photos. VN1Qien

also making progress on the 6inch foden front axle castings...

July, August, September 2019 production photos. YvSOmNG

and more water pump rods, i only made some of these last month  Rolling Eyes

July, August, September 2019 production photos. UKkVFQf

another main focus are kit 8's. for BU, SCC and DCC i believe !! im working on water fillers...

July, August, September 2019 production photos. Q9rXsyF

lids...

July, August, September 2019 production photos. RdGzn91

and just about to set up the water valve elbow...

July, August, September 2019 production photos. XapSRkq

spotted this next to the roller control model. the main diff gear seems to have its bevel gears !!

July, August, September 2019 production photos. HfqxGl9

and a quick look in the welding bay would suggest they are working on fire boxes. that reminds me, i have the fire box door holes the machine  Cool ...

July, August, September 2019 production photos. 71KYOOI

and something for the lyka people. not sure if you have seen these before, the seat base and back 1st off samples...

July, August, September 2019 production photos. BeRQ0Cb
craig@STW
craig@STW

Number of posts : 1410
Location : location Location
Registration date : 2010-05-06

Back to top Go down

July, August, September 2019 production photos. Empty Lyka laser cuts!!!

Post  Will@STW Thu 25 Jul 2019, 11:58 am

Hi everyone

I have some good news for the lykamobile costumers, the burner tray, smokehood and cladding laser cut have just arrived from the laser cutters. One of our welders, Mark, is currently organising them into piles ready to begin welding them together. Another crucial step towards this kit going out.

July, August, September 2019 production photos. 413

July, August, September 2019 production photos. 512

Thanks all

Will
Will@STW
Will@STW

Number of posts : 196
Age : 27
Location : Daventry
Registration date : 2019-01-29

Back to top Go down

July, August, September 2019 production photos. Empty Re: July, August, September 2019 production photos.

Post  Goliewogs Fri 26 Jul 2019, 9:01 am

Fantastic!! However, Mark is probably now in a deep depression knowing that he has all this welding to do! Good luck Mark (and the other welders) and I look forward to receiving the finished product(s) kit!! Much appreciated.
Greg

Goliewogs

Number of posts : 115
Age : 73
Location : FRANCE - Normandie
Registration date : 2016-03-28

Back to top Go down

July, August, September 2019 production photos. Empty Re: July, August, September 2019 production photos.

Post  craig@STW Fri 26 Jul 2019, 2:53 pm

this weeks photos.. as Will posted yesterday the laser cuts for the lyka burners are finally here and yes they are now working flat out to get this done.

sorting is finished...

July, August, September 2019 production photos. HNdi60C

July, August, September 2019 production photos. XxjbZnE

parts are being bent...

July, August, September 2019 production photos. SAXX62V

others are being rolled...

July, August, September 2019 production photos. TYnYc9W

and the welding has started...

July, August, September 2019 production photos. MNSUU01

probably worth saying now that we have two new welders after Harry left us some months ago and our other long term welder Lee retired almost a year ago. we did have another chap for a while but he didn't work out. We now have Mark (not to be confused with machine programmer mark) and Thomas.

with mark on the lyka parts, Thomas is on 6inch foden boilers...

July, August, September 2019 production photos. YmaHaFM

a lot of work on the machines has been focused on weld prep this week, as the guys work out what they need to get their required boilers done, its partly up to us to provide them with some of the missing parts. these are showman's/road loco fire holes...

July, August, September 2019 production photos. 6xPhjaG

other machine work this week has been finishing off various tender accessory kits...

July, August, September 2019 production photos. SZsLs2k

and im now setting up various levers for the 6inch foden kit 25. this is the regulator lever. if you look closely you can see an old stock part at the back. the front parts have had the handle turned on a lathe and the middle parts have had the first milling op done...

July, August, September 2019 production photos. XO7GddW
craig@STW
craig@STW

Number of posts : 1410
Location : location Location
Registration date : 2010-05-06

Back to top Go down

July, August, September 2019 production photos. Empty Re: July, August, September 2019 production photos.

Post  craig@STW Fri 02 Aug 2019, 2:43 pm

this weeks update more or less covers progress on last weeks items.

the 6inch foden kit 25 is coming on well with the regulator levers just waiting for the little "lugs" that go on the side of them...

July, August, September 2019 production photos. VdHIdmI

and a selection of different sized clevises are bring made...

July, August, September 2019 production photos. KO1s5uF

most of the kit is done...

July, August, September 2019 production photos. QtTj8Cl

the Lyka burners sheet work is progressing..

July, August, September 2019 production photos. U4Kvffk

July, August, September 2019 production photos. OQGyV27

Cool Cool Cool Cool

July, August, September 2019 production photos. F0ZCf2V

thomas is close to finishing his first batch of boilers...

July, August, September 2019 production photos. MCcBC42

and im also making a handful of lyka parts to make up short falls in stock...

July, August, September 2019 production photos. BK9HcrP

July, August, September 2019 production photos. YWjkHLz
craig@STW
craig@STW

Number of posts : 1410
Location : location Location
Registration date : 2010-05-06

Back to top Go down

July, August, September 2019 production photos. Empty Re: July, August, September 2019 production photos.

Post  craig@STW Fri 09 Aug 2019, 4:02 pm

this weeks photos...

we have another 15 DCC cylinder blocks waiting to go on the machine on monday...

July, August, September 2019 production photos. VLM9rWX

the 6inch foden regulator brackets are on the new machine...

July, August, September 2019 production photos. ARMkcJY

burrell ash-pan hinge pins

July, August, September 2019 production photos. UlN6xAW

and brake bands...

July, August, September 2019 production photos. 9z30gHD

water lifter castings arrived...

July, August, September 2019 production photos. MZ2VuWi

the pile of Lyka smokehoods is growing..

July, August, September 2019 production photos. 5J3nox3

and the new welders first batch of boilers are being tubed...

July, August, September 2019 production photos. SqIaokE

and prepared for pressure testing next week...

July, August, September 2019 production photos. YYzkSdb
craig@STW
craig@STW

Number of posts : 1410
Location : location Location
Registration date : 2010-05-06

Back to top Go down

July, August, September 2019 production photos. Empty Re: July, August, September 2019 production photos.

Post  BurrellSimplicity Fri 09 Aug 2019, 5:44 pm

thanks Craig,

can i ask why the boiler man holes are fake on the STW boilers. i use mine on my current engine every year to wash the shite from the bottom of the barrel out. way better than taking a plug in and out the tube plate with risk of stripping the threads.. just wondering what the reasoning behind it was / is


BurrellSimplicity

Number of posts : 74
Location : Scotland
Registration date : 2019-04-29

Back to top Go down

July, August, September 2019 production photos. Empty Re: July, August, September 2019 production photos.

Post  mikero Mon 19 Aug 2019, 12:47 pm

The plug on my 4.5" Foden does come out but as it is under the motion its an absolute pig to get out so I have never moved it.

Mick
mikero
mikero

Number of posts : 261
Location : Brighton
Registration date : 2011-07-19

Back to top Go down

July, August, September 2019 production photos. Empty Re: July, August, September 2019 production photos.

Post  LiveSteam Tue 20 Aug 2019, 8:13 pm

BurrellSimplicity wrote: way better than taking a plug in and out the tube plate with risk of stripping the threads..

My front tube plate plug comes out every other rally to add some boiler treatment and all the plugs (inc fusible) are pulled about 6 times a year for washing out, and again for its inspection. No sign of any risk of thread damage in 5yrs on an engine thats well into its teens Cool

Yes a manhole would be handy but I think the inclusion of one may increase the cost and design of the boiler somewhat.

LiveSteam

Number of posts : 788
Location : Hampshire
Registration date : 2013-09-08

Back to top Go down

July, August, September 2019 production photos. Empty Re: July, August, September 2019 production photos.

Post  craig@STW Fri 23 Aug 2019, 4:06 pm

no photos last week as i was on holiday. this week we have...

if you have been following the guides you may remember the 6inch Foden regulator levers. well these were finished with the small lugs attached...

July, August, September 2019 production photos. 1eM3Sbz

our Lyka has been brought up to date for the Dorset steam fair...

July, August, September 2019 production photos. A1BDq4m

July, August, September 2019 production photos. TYoevSf

and work is progressing with this kit with a lot of complex welding having to find its way through one person. i do believe he has broken the back of it now. inner trunking...

July, August, September 2019 production photos. HgRYq9A

and outer...

July, August, September 2019 production photos. AlT3hV0

and these will form the top of the boiler retaining straps...

July, August, September 2019 production photos. Ga91duW

also in the welding bay, BU and SCC gear guards...

July, August, September 2019 production photos. 2Qi4Yv9

also for BU and SCC, Helen is just finishing boxing up kit 10, this should go out on Tuesday...

July, August, September 2019 production photos. XkL5JYt

showmans/road loco cylinders are now on the 4th axis...

July, August, September 2019 production photos. 7dfyulR

im currently drilling Bu4 rear wheels...

July, August, September 2019 production photos. EHYUZfN

also got foden steam manifolds on the machines to go with the recently signed off boilers...

July, August, September 2019 production photos. Vxaezzt

July, August, September 2019 production photos. PA3xnXl

and working through the 2inch kit 11b. this is the valve buckle...

July, August, September 2019 production photos. V4rxFSG

July, August, September 2019 production photos. G4CmXcB
craig@STW
craig@STW

Number of posts : 1410
Location : location Location
Registration date : 2010-05-06

Back to top Go down

July, August, September 2019 production photos. Empty Re: July, August, September 2019 production photos.

Post  craig@STW Fri 06 Sep 2019, 4:06 pm

latest photos...

DCC cylinder blocks are all finished...

July, August, September 2019 production photos. J7mUU3T

im making a batch of BU4 gear change brackets from solid...

July, August, September 2019 production photos. Mxi24xd

actually made in 3 separate parts...

July, August, September 2019 production photos. Lp7zLrm

these are a pleasure to do on the new machine. can actually blast through them at a good cutting speed...

July, August, September 2019 production photos. XaP1WC1

to go with these we are also making gear change levers...

July, August, September 2019 production photos. Gy0AqXr

July, August, September 2019 production photos. Wrg0KEO

Roller gears...

July, August, September 2019 production photos. XtjtfEg

July, August, September 2019 production photos. 7s4Etze

and diff. kit due to leave on monday...

July, August, September 2019 production photos. OngA2C7

ive also finished drilling BU4 rear wheels...

July, August, September 2019 production photos. Huokzrf

and now working on the next BU2 kit, these are slidebars...

July, August, September 2019 production photos. FVSHPQ4

we now have around half of the Lyka sheet work done. these are still waiting to be welded...

July, August, September 2019 production photos. KXj6QlP

but the rest are done (aprox 15 kits worth)...

July, August, September 2019 production photos. R5tgO5Z

and test fitted in a box, yes we are that close now that the boxes are here...

July, August, September 2019 production photos. CFH5cN2

and the cladding and clamps are done...

July, August, September 2019 production photos. MQHLji7

and loads of fittings...

July, August, September 2019 production photos. 4yar0uJ

also for the lyka, 100's of seat spindles...

July, August, September 2019 production photos. 7jjYXpb

and as usual, boilers are in constant production...

July, August, September 2019 production photos. P9aE7zF
craig@STW
craig@STW

Number of posts : 1410
Location : location Location
Registration date : 2010-05-06

Back to top Go down

July, August, September 2019 production photos. Empty Re: July, August, September 2019 production photos.

Post  craig@STW Fri 20 Sep 2019, 4:05 pm

there are photos this week cheers cheers

we finally got the first of the lyka kits out this week....

July, August, September 2019 production photos. 8VLvJNr

these are the boiler bands...

July, August, September 2019 production photos. 7VZ5owU

still a fair bit of welding to do...

July, August, September 2019 production photos. MiteSDc

and the first of the seat bases have arrived...

July, August, September 2019 production photos. Dfs1TJb

since dorset we have been working on around 4 full kit dispatches...

July, August, September 2019 production photos. LYyNRfT

im making a few showmans/road loco parts... front spring hanger...

July, August, September 2019 production photos. HbznFOn

and im currently stretching the 4th axis to its limits to get the brake shaft key ways cut...

July, August, September 2019 production photos. N5ICYY8

also have a load of 2inch castings to work on. oh how i love these Mad . gear change arms...

July, August, September 2019 production photos. 4TEO0pt

water pumps...

July, August, September 2019 production photos. Cltjg7m

check valves...

July, August, September 2019 production photos. Sfj12dP

and lube tanks...

July, August, September 2019 production photos. QAX9rtf

the lathes are working on loads of very small 2inch parts and 4inch foden diff bosses...

July, August, September 2019 production photos. KDanlXD

and this will soon be some foden smoke box door rings...

July, August, September 2019 production photos. W7HJ4pl

the fabricated BU4 gear change brackets are currently being silver soldered together...

July, August, September 2019 production photos. YtxIYM8

and as always, boilers are being worked on. these are foden boilers being prepped for tubing...

July, August, September 2019 production photos. 74E9b6D
craig@STW
craig@STW

Number of posts : 1410
Location : location Location
Registration date : 2010-05-06

Back to top Go down

July, August, September 2019 production photos. Empty Re: July, August, September 2019 production photos.

Post  craig@STW Sat 28 Sep 2019, 10:48 am

this is going to be the last set of photos for this quarter, wow how time fly's.

Lyka Customers will be pleased to hear that the super wool has arrived and is being cut for immediate despatch. a simple thing to put together and get out to you, be warned... get your self a decent pair of gloves ready so you can work with this stuff...

July, August, September 2019 production photos. 3qnhI4U

July, August, September 2019 production photos. RbKtrP4

our blitz on 4inch foden parts is done, diff parts..

July, August, September 2019 production photos. TMCRb3h

front axle hangers...

July, August, September 2019 production photos. SLVpLAt

and blow down valves being just a few of the parts made...

July, August, September 2019 production photos. HU3rPoC

and a new batch of wheels have arrived...

July, August, September 2019 production photos. VH5td9F

remember those Burrell 4inch gear change brackets? Finally done...

July, August, September 2019 production photos. 2mEwIME

and more parts from this week include belly tank brackets...

July, August, September 2019 production photos. EZmAqNI

July, August, September 2019 production photos. NoiB35r

front spring hangers...

July, August, September 2019 production photos. ZBvXqtY

and gear guards...

July, August, September 2019 production photos. JnaEh8l

thats it. there wont be any photos next week as im off on holiday (spending the week at home with my new Grandson Cool ).

production priorities for next week will include roller kit 15 (steering) and BS kit 24 (water pump)
craig@STW
craig@STW

Number of posts : 1410
Location : location Location
Registration date : 2010-05-06

Back to top Go down

July, August, September 2019 production photos. Empty Re: July, August, September 2019 production photos.

Post  Sponsored content


Sponsored content


Back to top Go down

Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum