January/February/march 2018 production photos Empty January/February/march 2018 production photos

Post  craig@STW Fri 05 Jan 2018, 4:11 pm

hello and welcome to 2018, there was no production pics at the end of last year because we all finished early on the friday and as we were having a factory xmas clean-up, i didn't even have time to think.

so this is where we are at at the end of this week. i know i said we had seen the last of the Lyka kits for a bit but due to the nature of the water tanks, the manual guys have already started bending the sheet work...

January/February/march 2018 production photos HLLyRfr

and a new addition to the water tanks are internal baffles...

January/February/march 2018 production photos CP8ZvKd

on the machines, we now have the six inch foden smoke-boxes as complete units...

January/February/march 2018 production photos Fg85Om2

and the final holes have been drilled...

January/February/march 2018 production photos LHDWy93

i have also been working on the foden 6inch boiler cradle...

January/February/march 2018 production photos 04hmxQZ

and the front axle assembly...

January/February/march 2018 production photos KYrodf0

January/February/march 2018 production photos Pr0z6L9

and swivel hubs...

January/February/march 2018 production photos GswtHOx

BU roller 2nd shaft tubes are done...

January/February/march 2018 production photos 3Nqu0VX

January/February/march 2018 production photos WittIUj

i have now managed to finish the small batch of showmans rear axle tubes for the couple of customers who had these outstanding. these will be ready to send out next week. sorry for the delay but due to the accuracy and power needed on the bore holes we had to wait for our big machine to be available to finish these...

January/February/march 2018 production photos 2iw1eh3

on one of the lathes, roadloco smoke-box door rings...

January/February/march 2018 production photos 0f3VAeZ

and work has started on 100's of showmans rear wheel spokes. we counter sink these on the machines as it takes about 40 seconds to do 4 spokes...

January/February/march 2018 production photos RyKgkMc

and waiting to go on the large machine next week, 3 pallets of showmans rear wheels to have the spoke holes drilled...

January/February/march 2018 production photos F3FhwV9


Last edited by craig@STW on Mon 05 Mar 2018, 3:20 pm; edited 2 times in total
craig@STW
craig@STW

Number of posts : 1410
Location : location Location
Registration date : 2010-05-06

Back to top Go down

January/February/march 2018 production photos Empty Re: January/February/march 2018 production photos

Post  Mark the spark Thu 11 Jan 2018, 8:19 pm

Hi Craig
Any update on last 2 showmans kits?
Thanks

Mark the spark

Number of posts : 389
Location : Edinburgh
Registration date : 2015-04-26

Back to top Go down

January/February/march 2018 production photos Empty Re: January/February/march 2018 production photos

Post  craig@STW Fri 12 Jan 2018, 3:48 pm

all i can tell you on the last two showmans kits is that the one motor that was checked was unsuitable and another has been ordered and is on the way.

well this weeks photos do seem to be very much like last weeks, its just that things have moved on a bit or the model has changed.

the showmans rear wheels are on the machine and being drilled...

January/February/march 2018 production photos X5uwMSU

and with all the spokes for them countersunk we are now working on the spokes for the new batch of wagons (this is just a very small selection of the 100's of spokes we have had to do)...

January/February/march 2018 production photos LYd8dTY

and whilst on the subject of the wagons, this material if waiting to be turned into the hubs and inner and outer covers...

January/February/march 2018 production photos HJ9CZAf

having finished the 6inch foden smoke-boxes, we are now working on a batch for the road-locos...

January/February/march 2018 production photos Rf7ldhg

and the smoke-box rings...

January/February/march 2018 production photos JxfYVP7

the 6inch foden front cradle is on its last opp...

January/February/march 2018 production photos U1BKzPE

the manual section are working on the Lyka water tanks now...

January/February/march 2018 production photos WY1Demi

and most of the lathes are working on the various bushes that go into them. one part thats a little more interesting is the filler cap, this should look even better next week when i mill the outer edge...

January/February/march 2018 production photos JSwFVLL
craig@STW
craig@STW

Number of posts : 1410
Location : location Location
Registration date : 2010-05-06

Back to top Go down

January/February/march 2018 production photos Empty Re: January/February/march 2018 production photos

Post  craig@STW Fri 19 Jan 2018, 3:56 pm

this weeks photos  Very Happy

to carry on from exactly where we left off last week, here is the finished lyka water tank filler cap after final milling...

January/February/march 2018 production photos 6hXkLV9

January/February/march 2018 production photos TxtCoeC

all the showmans rear wheels are drilled and as usual we always put one together to make sure everything fits...

January/February/march 2018 production photos MlkPn6E

the other wheels we are working on are the smaller traction wagon wheels...

January/February/march 2018 production photos Yk6fzM7

the spokes...

January/February/march 2018 production photos QEEJQdb

the hubs...

January/February/march 2018 production photos Osp1aHE

and inner hub covers...

January/February/march 2018 production photos YaBw2Re

in this photo you can see the various stages of the hub machining process, from solid to (almost) finished...

January/February/march 2018 production photos DmLjejK

on the big machine... heavy machining cutting a 6inch foden chassis bracket from soild...

January/February/march 2018 production photos FJtqfsB

also this week some valve glands...

January/February/march 2018 production photos T3APbxv

January/February/march 2018 production photos J0Mw9jh

and as usual, i have tried to include something from the welding bay.

most of this weeks work has been on the lyka water tanks and Harry is now back on boilers, but i did manage to find something a little different. showmans roof stays having some short lengths of studding welded onto them...

January/February/march 2018 production photos NKKe02W
craig@STW
craig@STW

Number of posts : 1410
Location : location Location
Registration date : 2010-05-06

Back to top Go down

January/February/march 2018 production photos Empty Re: January/February/march 2018 production photos

Post  craig@STW Fri 26 Jan 2018, 4:01 pm

this weeks photos...

firstly, news on the showmans generator kit. Ian is currently investigating the modification of a car alternator. seems like a good plan to me, if its good enough for a car then i would think it would work on a model, but what do i know ??? Very Happy

January/February/march 2018 production photos V6QD4BI

in the machine shop, we are still cutting those large 6inch foden chassis brackets from solid. these things are big (if you compare them to the scrap cylinder blocks in the background) and most of the billet is cut away to be honest. the first side alone takes 18 mins to cut.

January/February/march 2018 production photos 1MDktU1

nearly done now...

January/February/march 2018 production photos XJZCien

we are also working on the second showmans rear hub/wheel kit...

January/February/march 2018 production photos 8Brfm4U

and with the wagon hubs and inner and outer covers done we are now onto the hub caps...

January/February/march 2018 production photos 5FBCHCs

January/February/march 2018 production photos DTw3TNl

and the rims arrived today, and will be on the machine on monday for drilling
(there are more than these as they are being un-wrapped as i type  Laughing )...

January/February/march 2018 production photos ZjFiLL2

where you have hubs you need an axle, among this lot we have wagon and water cart axles...

January/February/march 2018 production photos LRgKB8M

January/February/march 2018 production photos 1pywFOi

and not everything we do is complicated. here we are simply machining a radius on a ready made bush...

January/February/march 2018 production photos P6pYYcg

and in the welding bay... the Lyka water tanks are still being welded !!! most are now done and have been leak tested. And after having the extractor system serviced Harry can now concentrate on the latest batch of boilers...

January/February/march 2018 production photos MVXGRZP
craig@STW
craig@STW

Number of posts : 1410
Location : location Location
Registration date : 2010-05-06

Back to top Go down

January/February/march 2018 production photos Empty Re: January/February/march 2018 production photos

Post  Mark the spark Fri 26 Jan 2018, 4:27 pm

Car alternator is a good idea they can make lots of power but require 12volts to kick them into life

Mark the spark

Number of posts : 389
Location : Edinburgh
Registration date : 2015-04-26

Back to top Go down

January/February/march 2018 production photos Empty Re: January/February/march 2018 production photos

Post  LiveSteam Fri 26 Jan 2018, 6:45 pm

Mark the spark wrote:Car alternator is a good idea they can make lots of power but require 12volts to kick them into life

That was my thought, they often will start generating on their own but without a 12v battery for a base line it can kill the regulator off pretty quick. Although they do have to go round a fair few lick and I'm not sure the showmans will be able run at the speed it needs to ?
I might be tempted to investigate generators that wind power folks use ?

LiveSteam

Number of posts : 777
Location : Hampshire
Registration date : 2013-09-08

Back to top Go down

January/February/march 2018 production photos Empty Re: January/February/march 2018 production photos

Post  Mark the spark Sun 28 Jan 2018, 12:18 pm

If your are looking at alternators then I would surgest looking at ones fitted to diesels as they often have a shaft or output to drive a vacuum pump for the brakes and you should be able to use that for the exciter drive
Mark

Mark the spark

Number of posts : 389
Location : Edinburgh
Registration date : 2015-04-26

Back to top Go down

January/February/march 2018 production photos Empty Re: January/February/march 2018 production photos

Post  Ian Mon 29 Jan 2018, 9:43 am

LiveSteam wrote:
Mark the spark wrote:Car alternator is a good idea they can make lots of power but require 12volts to kick them into life

That was my thought, they often will start generating on their own but without a 12v battery for a base line it can kill the regulator off pretty quick. Although they do have to go round a fair few lick and I'm not sure the showmans will be able run at the speed it needs to ?
I might be tempted to investigate generators that wind power folks use ?

That's the avenue I am currently investigating firstly 24V alternator so we can go slower to get 12V and a rare earth permanent magnet rotor so we don't need to excite it with a battery, just like the wind power people but without a regulator, output will be governed load and by RPM.
The diameter of the flywheel and the diameter the generator drive pulley will push up the RPM at the generator rotor.

Ian

Number of posts : 113
Age : 68
Location : Daventry
Registration date : 2008-06-30

Back to top Go down

January/February/march 2018 production photos Empty Re: January/February/march 2018 production photos

Post  LiveSteam Mon 29 Jan 2018, 8:07 pm

Ian wrote:
LiveSteam wrote:
Mark the spark wrote:Car alternator is a good idea they can make lots of power but require 12volts to kick them into life

That was my thought, they often will start generating on their own but without a 12v battery for a base line it can kill the regulator off pretty quick. Although they do have to go round a fair few lick and I'm not sure the showmans will be able run at the speed it needs to ?
I might be tempted to investigate generators that wind power folks use ?

That's the avenue I am currently investigating firstly 24V alternator so we can go slower to get 12V and a rare earth permanent magnet rotor so we don't need to excite it with a battery, just like the wind power people but without a regulator, output will be governed load and by RPM.
The diameter of the flywheel and the diameter the generator drive pulley will push up the RPM at the generator rotor.

Sounds very much like my Hornet wind generator, which is basically a regular vehicle alternator stripped out with a rare earth rotor fitted.

Its one of these https://www.ebay.co.uk/itm/Wind-Generator-PMA-G-Generator-alternator-UK-supply-for-serious-wind-turbines/371642671583 although I didnt pay that for mine but then I bought mine 10yrs ago now, puts out crazy amounts of juice Cool


LiveSteam

Number of posts : 777
Location : Hampshire
Registration date : 2013-09-08

Back to top Go down

January/February/march 2018 production photos Empty Re: January/February/march 2018 production photos

Post  craig@STW Fri 02 Feb 2018, 3:59 pm

photos from this week...

the big machine has finished blocking out the first 6inch foden bracket...

January/February/march 2018 production photos VWEEa2T

and is now onto the second...

January/February/march 2018 production photos ST40K3U

with the traction trailer hubs done we are now on the ones for the normal driving wagon...

January/February/march 2018 production photos N2Rh5DK

January/February/march 2018 production photos UNwk0UH

the roadloco smoke-boxes have had their rings welded in and are ready for machining...

January/February/march 2018 production photos KacWay6

in the welding bay, fire boxes are under construction...

January/February/march 2018 production photos FJ7xpcu

and the welded boilers are having their tubes fitted...

January/February/march 2018 production photos VlogBdR
craig@STW
craig@STW

Number of posts : 1410
Location : location Location
Registration date : 2010-05-06

Back to top Go down

January/February/march 2018 production photos Empty Re: January/February/march 2018 production photos

Post  craig@STW Fri 09 Feb 2018, 3:58 pm

this weeks photos. we seem to be stuck on the same few jobs at the moment but its really because of quantity and size of parts that things are taking time.

the second of the 6inch foden chassis brackets are just about done...

January/February/march 2018 production photos YAnwZqw

wagon hubs are done...

January/February/march 2018 production photos Ew2SXMt

but now we are on the inner and outer covers and hub caps...

January/February/march 2018 production photos LiQYRcY

January/February/march 2018 production photos ZuEh129

the roadloco smoke boxes are now on for drilling...

January/February/march 2018 production photos Op3HmOq

next on the machines will be these small 2inch water fillers, they just need the mounting holes drilling...

January/February/march 2018 production photos HOKbsAE

on the live-tooling Hass machine we have lyka fuel tank filler caps...

January/February/march 2018 production photos Lrh7Ylb

January/February/march 2018 production photos YstsqRD

and the fuel tanks are being welded now. note the extra sump area for any unwanted bits of dirt...

January/February/march 2018 production photos 9tu0zFT

the outer tubes for the lyka boilers have arrived...

January/February/march 2018 production photos Z2GPFze

these photos show the general arrangement of the water tanks and boiler...

January/February/march 2018 production photos JPOTUTh

January/February/march 2018 production photos TwXD7cN

and our weekly look in the welding area... well to me this looks exactly like a photo we had about 3 weeks back but Harry assures me it is a completely different boiler near to completion  scratch  Rolling Eyes  Laughing ...

January/February/march 2018 production photos 0FPmNy5
craig@STW
craig@STW

Number of posts : 1410
Location : location Location
Registration date : 2010-05-06

Back to top Go down

January/February/march 2018 production photos Empty Re: January/February/march 2018 production photos

Post  craig@STW Fri 16 Feb 2018, 3:55 pm

this weeks photos.

the wagon hubs, and inner and outer hub covers are done and we now just need to finish drilling the hub caps...

January/February/march 2018 production photos JFxt5xo

and just when you think you are coming to the end of the wagon wheels... the rims for the rear arrive !!!

January/February/march 2018 production photos LgBG90c

so after simple drilling...

January/February/march 2018 production photos 5M8H2bx

and a test fitting, they are ready to go...

January/February/march 2018 production photos WBblWRL

road-loco smoke boxes are finished on the 4th axis, but then we pop out the door rings and drill the hinge mounting holes and mill the dart bar slot...

January/February/march 2018 production photos Q5zfNHP

and the smoke-box to boiler flange is milled to size...

January/February/march 2018 production photos 4XARR8f

the large machine is drilling Showman's horn-plates...

January/February/march 2018 production photos YXsBY55

and the 6inch foden rear axles are coming together...

January/February/march 2018 production photos P4DsVDt

January/February/march 2018 production photos LnxDO9c

in the welding area its all hands on deck to get the lyka tanks finished, this is the fixing of the mounting brackets...

January/February/march 2018 production photos B23VvZq

and the three tanks in position in the chassis...

January/February/march 2018 production photos GnblevN
craig@STW
craig@STW

Number of posts : 1410
Location : location Location
Registration date : 2010-05-06

Back to top Go down

January/February/march 2018 production photos Empty Re: January/February/march 2018 production photos

Post  craig@STW Fri 23 Feb 2018, 3:47 pm

this weeks photos...

last week we had a photo of the showmans horn-plate on the large machine. well this week we are onto the opposite hand...

January/February/march 2018 production photos 7ca8Oap

having just finished kit 3 of the showmans/road loco we are actually now working on kit 2 !!! this was down to a delay in the front axle castings. these are now in and done, with just the wheel retaining collar/pin hole to drill...

January/February/march 2018 production photos TKOPAIA

January/February/march 2018 production photos VwFuFgj

also from kit 2, perch brackets...

January/February/march 2018 production photos V9KM9aB

January/February/march 2018 production photos VTmRUpV

and front forks...

January/February/march 2018 production photos UoBY9gW

and the early part of this week was just spent finishing parts you have already seen. loads of wagon wheels and another eight showmans rear wheels...

January/February/march 2018 production photos SEsYj5n

January/February/march 2018 production photos THQVctf

and those Lyka tanks are finally done.

January/February/march 2018 production photos RGGn7n2

January/February/march 2018 production photos 3RXA3aC

January/February/march 2018 production photos Bckthvr

with a couple of people off on holiday (Harry the welder and myself for the first half of the week) its been a quiet week overall Exclamation Exclamation
craig@STW
craig@STW

Number of posts : 1410
Location : location Location
Registration date : 2010-05-06

Back to top Go down

January/February/march 2018 production photos Empty Re: January/February/march 2018 production photos

Post  Mark the spark Fri 23 Feb 2018, 3:51 pm

Are you any further on with showmans dyno kits?
Mark

Mark the spark

Number of posts : 389
Location : Edinburgh
Registration date : 2015-04-26

Back to top Go down

January/February/march 2018 production photos Empty Re: January/February/march 2018 production photos

Post  NorfolkModelSteam Fri 23 Feb 2018, 4:42 pm

All looking good but any bits for the roller?

NorfolkModelSteam

Number of posts : 94
Location : Downham Market
Registration date : 2015-10-15

Back to top Go down

January/February/march 2018 production photos Empty Re: January/February/march 2018 production photos

Post  craig@STW Mon 05 Mar 2018, 3:44 pm

sorry for the lack of photos on friday. Daventry was cut off by the snow, and anyone who lives outside the town, including me could not get in. pale pale

anyway, these are the photos...

these are the wheel retaining collars for the 6inch foden rear axle. as you can see the left and right are different. being round, this one is a turned part...

January/February/march 2018 production photos ZfCXBU4

and the opposite one is a 100% milled part !!!

January/February/march 2018 production photos F0BZ31O

these are the roadloco/showmans kit 3 chimney bases...

January/February/march 2018 production photos JTGIba7

January/February/march 2018 production photos Yvuutgn

whistle bases...

January/February/march 2018 production photos LAVufle

January/February/march 2018 production photos 3DCU5VL

and more parts for the 6inch foden kit1. we are slowly working through these to replenish stock...

January/February/march 2018 production photos CvzzFoo

the showmans horn-plates that we drilled over the last couple of weeks are in the welding bay having the off-set section attached. once done, these will go back on the machine for final milling...

January/February/march 2018 production photos 3bkSQFs

and also from the welding bay... well its another boiler shot. tried to get something a little different this week. with the end plate still to be attached this gives a nice view of the water jacket...

January/February/march 2018 production photos EkLIati
craig@STW
craig@STW

Number of posts : 1410
Location : location Location
Registration date : 2010-05-06

Back to top Go down

January/February/march 2018 production photos Empty Re: January/February/march 2018 production photos

Post  Jim the Shovel Mon 05 Mar 2018, 8:55 pm

Nice to see shots like that showing the general build up.

Some time ago there was some videos posted showing the mill in action.
Would also be good to see a CNC machine in action.
It's good to see these as it gives us a better insight into the process.

Jimbo
Jim the Shovel
Jim the Shovel

Number of posts : 106
Location : Isle of Wight
Registration date : 2015-06-30

Back to top Go down

January/February/march 2018 production photos Empty Re: January/February/march 2018 production photos

Post  Lynn@STW Mon 12 Mar 2018, 10:33 am

Since Craig is off sick at the moment. Just a few pictures from the floor.
Lots in production and packaging.


January/February/march 2018 production photos JvlTlkw

January/February/march 2018 production photos 8v3aDKt

January/February/march 2018 production photos 8LbWseT

January/February/march 2018 production photos KKP5YbU

January/February/march 2018 production photos FsbrV4S

January/February/march 2018 production photos ZgXr6XH

January/February/march 2018 production photos 2PMho8K

January/February/march 2018 production photos X5x8JU8

January/February/march 2018 production photos YW1Okyf

January/February/march 2018 production photos 46PJ4fj


Lynn@STW

Number of posts : 166
Location : Daventry
Registration date : 2017-07-19

http://www.steamtractionworld.co.uk

Back to top Go down

January/February/march 2018 production photos Empty Re: January/February/march 2018 production photos

Post  Goliewogs Thu 22 Mar 2018, 3:52 pm

What has happened to the latest production guides - I am missing them, they are the highlight of my week! Thanks
Greg

Goliewogs

Number of posts : 115
Age : 73
Location : FRANCE - Normandie
Registration date : 2016-03-28

Back to top Go down

January/February/march 2018 production photos Empty Re: January/February/march 2018 production photos

Post  LiveSteam Thu 22 Mar 2018, 7:01 pm

Goliewogs wrote:What has happened to the latest production guides - I am missing them, they are the highlight of my week! Thanks
Greg

We're only missing this weeks one really and Lynn does say Craig was off sick on the last one so maybe he's still not a well bunny.

LiveSteam

Number of posts : 777
Location : Hampshire
Registration date : 2013-09-08

Back to top Go down

January/February/march 2018 production photos Empty Re: January/February/march 2018 production photos

Post  Lynn@STW Thu 22 Mar 2018, 7:55 pm

Hi

Yes Craig was still off last Friday and I was busy. So no pictures. Hopefully some tomorrow.

Lynn@STW

Number of posts : 166
Location : Daventry
Registration date : 2017-07-19

http://www.steamtractionworld.co.uk

Back to top Go down

January/February/march 2018 production photos Empty Re: January/February/march 2018 production photos

Post  craig@STW Fri 23 Mar 2018, 4:04 pm

yes, we have photos today cheers glad to hear that your missing the guides. we have been hit with the lurgy at STW recently. I was the latest to come down with the flu and our machine loader has been off this week.

i'm back now and thanks to Lynn for providing a few photos for you too look at.

the main task for the machines this week was to do the final operation on the showman/road loco horn plates. Lynn posted a photo of the plate after welding and now the final holes for the bearing housing have been done...

January/February/march 2018 production photos VMP3rZ5

i'm also halfway through a couple of batches of boiler barrels. the new roller barrel is based on the normal Burrel one but is 30mm shorter and has a different hole pattern for the smokebox mount...

January/February/march 2018 production photos NTcPbFo

and with them done i'm now onto the normal Burrel ones. nice to have two jobs follow one another with no real change to the set up...

January/February/march 2018 production photos Mh4rRkg

and my final main job this week is the main 6inch foden chassis rails for the kit 1 that we have been picking away at over the last month or so. these are the small sections at the ends of the rail that provide the "kick in" towards the boiler cradle..

January/February/march 2018 production photos GwSn9VB

January/February/march 2018 production photos AGpRUdU

and waiting out the back are the main rails. I'll hopefully get on to these by Monday (and then probably be off again with a bad back No Wink )

January/February/march 2018 production photos Ix3OPL1

looks like another batch of Burrel/roller cylinder block castings have arrived...

January/February/march 2018 production photos QKjLWSd

and Mark has just started turning some rear cylinder covers...

January/February/march 2018 production photos 4eP3okO

some of the parts that are waiting to be packed this week include Burrel tender top plates...

January/February/march 2018 production photos MpenVnX

showmans boiler bands...

January/February/march 2018 production photos Pd31EAs

6inch foden rear radius arms...

January/February/march 2018 production photos JC8tTgg

and the perch and pivots for the 4inch burrels....

January/February/march 2018 production photos YPpx1aq

into the welding/boiler making area and... well no surprise really, its another boiler  Laughing  this is a 6inch foden boiler at the very first stage of construction. here Harry is literally tacking the plates into place. this is actually the most critical part of the build, as getting the dimensions wrong here will lead to a lot of problems further on...

January/February/march 2018 production photos Q662n2X

January/February/march 2018 production photos 4FLajs9
craig@STW
craig@STW

Number of posts : 1410
Location : location Location
Registration date : 2010-05-06

Back to top Go down

January/February/march 2018 production photos Empty Re: January/February/march 2018 production photos

Post  craig@STW Fri 23 Mar 2018, 4:17 pm

I didn't miss the request for more Videos. there is no problem with making any more, it just takes a bit more time and not all the jobs are that interesting, plus it can be hard to film things with coolant and swarf flying around.

all the old clips are still available. they are stored on my own personal you tube account and will not be deleted, however the links to them are spread all over the forum in the years of posts that have sadly lost their photo links Neutral

i think the first thing to do is to create a new "pinned" topic at the top of the guide area that brings all the old videos together in one place. Then i can look at creating a few more Cool
craig@STW
craig@STW

Number of posts : 1410
Location : location Location
Registration date : 2010-05-06

Back to top Go down

January/February/march 2018 production photos Empty Re: January/February/march 2018 production photos

Post  Mark the spark Fri 23 Mar 2018, 5:38 pm

Thanks for the update Craig
Is there any news on the last 2 showmans kits
Thanks Mark

Mark the spark

Number of posts : 389
Location : Edinburgh
Registration date : 2015-04-26

Back to top Go down

January/February/march 2018 production photos Empty Re: January/February/march 2018 production photos

Post  Sponsored content


Sponsored content


Back to top Go down

Page 1 of 2 1, 2  Next

Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum