February/March/April 2017 Production
A few photos from this week...
safety valve bases...
and levers...
BS kit28 in the boxes (just left the factory as i type)
BS reversing levers...
and 2nd shaft gear guards...
starting valve bracket...
Lyka front stub axle assemblies getting welded...
and we have started on the inner flange of the lyka wheel hub
safety valve bases...
and levers...
BS kit28 in the boxes (just left the factory as i type)
BS reversing levers...
and 2nd shaft gear guards...
starting valve bracket...
Lyka front stub axle assemblies getting welded...
and we have started on the inner flange of the lyka wheel hub
Last edited by craig@STW on Sat 08 Apr 2017, 10:43 am; edited 3 times in total
craig@STW- Number of posts : 1410
Location : location Location
Registration date : 2010-05-06
Re: February/March/April 2017 Production
looks great cant wait to get my kit on Monday
Mark
Mark
Mark the spark- Number of posts : 389
Location : Edinburgh
Registration date : 2015-04-26
Re: February/March/April 2017 Production
this weeks photos...
lyka steering upright...
lyka stub axles all together...
in place on the control model...
lyka hub flanges with loads on very small spoke holes...
and the outer flanges now being turned...
2inch burrell weighshaft bracket parts...
2inch burrell front wheel rims being drilled...
4inch gauge plinths...
and finished starting valve...
lyka steering upright...
lyka stub axles all together...
in place on the control model...
lyka hub flanges with loads on very small spoke holes...
and the outer flanges now being turned...
2inch burrell weighshaft bracket parts...
2inch burrell front wheel rims being drilled...
4inch gauge plinths...
and finished starting valve...
craig@STW- Number of posts : 1410
Location : location Location
Registration date : 2010-05-06
Re: February/March/April 2017 Production
This week we are looking to Ship Lykamobile kit 2, Foden 6" Kit 28, SCC kit 22b and Burrell Agricultural Kit 22b
Ian- Number of posts : 113
Age : 68
Location : Daventry
Registration date : 2008-06-30
Re: February/March/April 2017 Production
Did the next SCC kit go out the door? It has been two months since the last kit was delivered and hoping to make a rally or two this year!
Its complete should go out on Wednesday, then your on your final kit so I guess rallies are looking good for this year.
Its complete should go out on Wednesday, then your on your final kit so I guess rallies are looking good for this year.
Alan Grant- Number of posts : 29
Age : 49
Location : Aberdeenshire
Registration date : 2013-09-06
Re: February/March/April 2017 Production
BU4 and SCC kits 22B are now complete and should be despatched Wednesday, Lyka kit 2 and Foden 6" kit 28 have left.
Currently progressing BU2 kit 16B, Roller kit 9, DCC kit 29 and Foden 6" kit 29
Currently progressing BU2 kit 16B, Roller kit 9, DCC kit 29 and Foden 6" kit 29
Ian- Number of posts : 113
Age : 68
Location : Daventry
Registration date : 2008-06-30
Re: February/March/April 2017 Production
no photos last week as i was on holiday.
here are the latest images.
2inch pressure gauge plinths...
2inch weigh-shaft brackets together and having final machining...
nameplate bosses...
safety valves together and pressure set...
regulator clevis...
regulator bracket...
hornplates for the roller...
lyka wheel hubs are together and having the final set of spoke holes drilled...
and Harry is starting on a new batch of 4inch agricultural boilers...
here are the latest images.
2inch pressure gauge plinths...
2inch weigh-shaft brackets together and having final machining...
nameplate bosses...
safety valves together and pressure set...
regulator clevis...
regulator bracket...
hornplates for the roller...
lyka wheel hubs are together and having the final set of spoke holes drilled...
and Harry is starting on a new batch of 4inch agricultural boilers...
craig@STW- Number of posts : 1410
Location : location Location
Registration date : 2010-05-06
Re: February/March/April 2017 Production
OK a few photos from this week.
the lyka hubs are ready to go out to be built into wheels...
roller horn-plates are still on the mill with the spectacle plates being worked on as well...
and some more laser cut parts for that kit...
6inch foden brake pedals...
and eccentrics...
4inch foden differential...
4inch burrell boiler barrels on the mill...
and machining the weld prep on the fire hole rings...
the lyka hubs are ready to go out to be built into wheels...
roller horn-plates are still on the mill with the spectacle plates being worked on as well...
and some more laser cut parts for that kit...
6inch foden brake pedals...
and eccentrics...
4inch foden differential...
4inch burrell boiler barrels on the mill...
and machining the weld prep on the fire hole rings...
craig@STW- Number of posts : 1410
Location : location Location
Registration date : 2010-05-06
Re: February/March/April 2017 Production
not a lot to see this week that you haven't seen already, but we have nearly finished the roller horn-plate kit. the LH horn-plate is a welded fabrication...
and this needs final machining...
and so the kit is done...
Ian is just prepping the tender so he can join the two together...
a lot of this week has been spent making parts for electric sentinel kits...
and this needs final machining...
and so the kit is done...
Ian is just prepping the tender so he can join the two together...
a lot of this week has been spent making parts for electric sentinel kits...
craig@STW- Number of posts : 1410
Location : location Location
Registration date : 2010-05-06
Re: February/March/April 2017 Production
a bit more to see this week !!!
a quick pic to show the roller horn-plate and tender kit together...
and progress on the roller kit 1a and kit 1b. most of it is now done. need to get the "wheels" on the mill for drilling before we can get one together...
more tender parts to do soon, this time basic 4inch burrell...
also some 4inch walkboard brackets...
and lubricator brackets...
showmans/roadloco starter knobs...
4inch foden diff parts...
and a fair bit of work done on the electric sentinel kits. the plate work its being bent now...
and the main chassis parts have been machined and are now being welded together...
a quick pic to show the roller horn-plate and tender kit together...
and progress on the roller kit 1a and kit 1b. most of it is now done. need to get the "wheels" on the mill for drilling before we can get one together...
more tender parts to do soon, this time basic 4inch burrell...
also some 4inch walkboard brackets...
and lubricator brackets...
showmans/roadloco starter knobs...
4inch foden diff parts...
and a fair bit of work done on the electric sentinel kits. the plate work its being bent now...
and the main chassis parts have been machined and are now being welded together...
craig@STW- Number of posts : 1410
Location : location Location
Registration date : 2010-05-06
Re: February/March/April 2017 Production
Looks like things are progressing nicely on a number of fronts. Those roller wheels look quite heavy, hope you have had your weetabix before carrying them around the factory. Keep up the good work.
Re: February/March/April 2017 Production
OK, i was on holiday last friday and the PC at work was playing up today so im posting from home again this week
the roller "wheels" have now been drilled...
they are not too heavy, lighter than a BU rear wheel Â
and the hub sections are all finished...
a pallet load of electric sentinel chassis...
and an interesting photo of a boiler during construction...
I've spent a lot of time this week on 2inch governor bases...
water pumps...
and check valves...
from the lathes we have 6inch foden eccentric straps...
and water pump covers...
and BU tender fillets (to be segmented later on the mill)...
and the lyka diff castings have been turned. they just need the internals milling...
the roller "wheels" have now been drilled...
they are not too heavy, lighter than a BU rear wheel Â
and the hub sections are all finished...
a pallet load of electric sentinel chassis...
and an interesting photo of a boiler during construction...
I've spent a lot of time this week on 2inch governor bases...
water pumps...
and check valves...
from the lathes we have 6inch foden eccentric straps...
and water pump covers...
and BU tender fillets (to be segmented later on the mill)...
and the lyka diff castings have been turned. they just need the internals milling...
craig@STW- Number of posts : 1410
Location : location Location
Registration date : 2010-05-06
Re: February/March/April 2017 Production
photos for last week...
the roller "wheels" kit was finished and sent out. the pair of wheels look great together on the single axle...
also the rear wheels have arrived. we have three pallets of these...
the lyka diff castings have been split and the inner area machined...
and fitted to the control model...
I cant remember if i posted a photo of the prototype spring set, but there it is. we will be working on these next week...
the bu tender fillets from last week have had the backs turned...
and are now on the mill to be segmented...
and the pile of electric sentinel parts is still growing...
there wont be anymore photos till after Easter now because I'm on holiday next week, but if your lucky you may get an update from Ian.
Don't forget to pester him with any and all of your production questions
the roller "wheels" kit was finished and sent out. the pair of wheels look great together on the single axle...
also the rear wheels have arrived. we have three pallets of these...
the lyka diff castings have been split and the inner area machined...
and fitted to the control model...
I cant remember if i posted a photo of the prototype spring set, but there it is. we will be working on these next week...
the bu tender fillets from last week have had the backs turned...
and are now on the mill to be segmented...
and the pile of electric sentinel parts is still growing...
there wont be anymore photos till after Easter now because I'm on holiday next week, but if your lucky you may get an update from Ian.
Don't forget to pester him with any and all of your production questions
craig@STW- Number of posts : 1410
Location : location Location
Registration date : 2010-05-06
Re: February/March/April 2017 Production
Ian, is there any news on the last SCC kit?
Alan Grant- Number of posts : 29
Age : 49
Location : Aberdeenshire
Registration date : 2013-09-06
Re: February/March/April 2017 Production
Hi Ian any news on the 2inch governor's yet
Thanks steve
Thanks steve
steam oil- Number of posts : 25
Age : 68
Location : DERBYSHIRE
Registration date : 2013-11-09
Re: February/March/April 2017 Production
steam oil wrote:Hi Ian any news on the 2inch governor's yet
Thanks steve
base casting are now machined just need to prove the whole assy out now
so soon after Easter is best guess
Ian- Number of posts : 113
Age : 68
Location : Daventry
Registration date : 2008-06-30
Re: February/March/April 2017 Production
Alan Grant wrote:Ian, is there any news on the last SCC kit?
we are producing this kit along with kit 23 of the Agi the machined parts are done but all the seat parts need fabricating and we have a backlog in that dept so we are still looking a couple of weeks (we are as eager for your money as you are for our kit) it will be as soon as possible.
Ian- Number of posts : 113
Age : 68
Location : Daventry
Registration date : 2008-06-30
Re: February/March/April 2017 Production
With March's kit being late, for the 2", will there be a kit this mouth (April) .
Charlie
Charlie
chas12154- Number of posts : 412
Age : 63
Location : Totton, Southampton, Hampshire
Registration date : 2015-01-21
Re: February/March/April 2017 Production
steam oil wrote:Hi Ian any news on the 2inch governor's yet
Thanks steve
All governor parts now proven to fit.
Don't have anyone to pack it this week due to holidays, so early next week it should be on its way to you
Ian- Number of posts : 113
Age : 68
Location : Daventry
Registration date : 2008-06-30
Re: February/March/April 2017 Production
Thanks Ian for the update
Thanks steve
Thanks steve
steam oil- Number of posts : 25
Age : 68
Location : DERBYSHIRE
Registration date : 2013-11-09
Re: February/March/April 2017 Production
just a few photos from this week. a few people have been on holiday over the last few weeks so its been a bit slow.
the machine shop has been making parts for the scc seat base...
so the manual section can get on with bending, forming and welding...
lyka spring set now on the control model...
im drilling loads of roller rear wheel rims...
6inch foden front axle tubes...
and showmans tender sides...
the machine shop has been making parts for the scc seat base...
so the manual section can get on with bending, forming and welding...
lyka spring set now on the control model...
im drilling loads of roller rear wheel rims...
6inch foden front axle tubes...
and showmans tender sides...
craig@STW- Number of posts : 1410
Location : location Location
Registration date : 2010-05-06
Re: February/March/April 2017 Production
photos for this week
some of the parts on the cnc machines this week, 2 inch burell chimney bases...
showmans motion rings...
4 inch foden torsion bar brackets...
4 inch burrell pipe clamps...
6 inch foden king-pins...
also a burrell boiler being "tubed"...
4 inch foden RH diff housings welded together...
more burrell tender parts have arrived !!!...
and to add to the roller wheels over the last couple of weeks a few sets with solid rims. these are very heavy...
some of the parts on the cnc machines this week, 2 inch burell chimney bases...
showmans motion rings...
4 inch foden torsion bar brackets...
4 inch burrell pipe clamps...
6 inch foden king-pins...
also a burrell boiler being "tubed"...
4 inch foden RH diff housings welded together...
more burrell tender parts have arrived !!!...
and to add to the roller wheels over the last couple of weeks a few sets with solid rims. these are very heavy...
craig@STW- Number of posts : 1410
Location : location Location
Registration date : 2010-05-06
Similar topics
» January, February, March 2019 Production Photos
» January/February/march 2018 production photos
» January, February, March 2020 production photos.
» January/February/March 2015 production photos
» New year, new thread... January, March 2016 (no February)
» January/February/march 2018 production photos
» January, February, March 2020 production photos.
» January/February/March 2015 production photos
» New year, new thread... January, March 2016 (no February)
Page 1 of 1
Permissions in this forum:
You cannot reply to topics in this forum