4"Burrell boilers
2 posters
Page 1 of 1
4"Burrell boilers
hi great news on the boilers and your letter was very welcome, congratulations on your progress throughout the range.
could you let us know how much the boilers weigh and a rough size, as we have to collect them i may be able to take two on a trailer back down south through sussex to bexhill near hastings to share cost and time.
tompettitt
could you let us know how much the boilers weigh and a rough size, as we have to collect them i may be able to take two on a trailer back down south through sussex to bexhill near hastings to share cost and time.
tompettitt
tompettitt- Number of posts : 14
Location : bexhill in sussex (4" burrell at kit9)
Registration date : 2008-10-03
Re: 4"Burrell boilers
Hi Tom,
Each boiler weighs around 75kg - 80kg and measures approx 850mm long x 250mm wide x 400mm High.
Regards
Dean
Each boiler weighs around 75kg - 80kg and measures approx 850mm long x 250mm wide x 400mm High.
Regards
Dean
Re: 4"Burrell boilers
We are hopeful that we will be in the position to despatch the first 9 boilers at the end of this month. Any customer who would like one of these 9 boilers would need to be in the position to make both outstanding boiler payments (and hopefully kit 16A also ) and must be able to collect the boiler from the factory. If you would like one of the first nine boilers then please get in touch and let us know.
Re: 4"Burrell boilers
Hi 4" Burrell Customers,
The boiler inspector has visited today and passed off the first 11 boilers. These 11 have already been allocated and collection can commence from tomorrow (Friday 3rd April) for those customers. It is intention to try to achieve a further batch of 10 before the end of April. Below are a couple of photo's of all the boilers on hydraulic test just after approval. Exciting Stuff.
Regards
Dean & Steve
The boiler inspector has visited today and passed off the first 11 boilers. These 11 have already been allocated and collection can commence from tomorrow (Friday 3rd April) for those customers. It is intention to try to achieve a further batch of 10 before the end of April. Below are a couple of photo's of all the boilers on hydraulic test just after approval. Exciting Stuff.
Regards
Dean & Steve