6 inch foden progress...
Page 1 of 1
6 inch foden progress...
we have received the sample castings for the Axel boxes...
seen here with a 4 inch Axel box...
and the front wheel castings arrived on Thursday...
there's a lot to do on these so they have gone straight onto the lathe...
seen here with a 4 inch Axel box...
and the front wheel castings arrived on Thursday...
there's a lot to do on these so they have gone straight onto the lathe...
craig@STW- Number of posts : 1410
Location : location Location
Registration date : 2010-05-06
Re: 6 inch foden progress...
the front wheels are now done and will be going off for vulcanizing on Monday...
craig@STW- Number of posts : 1410
Location : location Location
Registration date : 2010-05-06
Re: 6 inch foden progress...
still waiting for the wheel rims to come back from vulcanizing, should be any day now.
hubcaps are done and ready...
hubcaps are done and ready...
craig@STW- Number of posts : 1410
Location : location Location
Registration date : 2010-05-06
Re: 6 inch foden progress...
more photos of the foden wheels...
the finished fronts...
and the rear castings...
.
these are having the first face/half machined now. they take about 40 minutes each...
and the brake drum brackets are on one of the mills, only 240 of these to make...
these will go in the inside of the wheel rims before the tyres go on...
the finished fronts...
and the rear castings...
.
these are having the first face/half machined now. they take about 40 minutes each...
and the brake drum brackets are on one of the mills, only 240 of these to make...
these will go in the inside of the wheel rims before the tyres go on...
craig@STW- Number of posts : 1410
Location : location Location
Registration date : 2010-05-06
Re: 6 inch foden progress...
rear wheels are nearly done on the lathes. on the mills next for drilling...
craig@STW- Number of posts : 1410
Location : location Location
Registration date : 2010-05-06
Re: 6 inch foden progress...
the good news is that the rear wheels have gone off for vulcanizing.
some photos of them on the mills...
cutting the "flats" for the brake drum brackets...
and then onto the 4th axis machine to drill the mounting holes...
and with the brackets mounted in place...
more good news is that we have the front cradle castings and the stub axles !!!
some photos of them on the mills...
cutting the "flats" for the brake drum brackets...
and then onto the 4th axis machine to drill the mounting holes...
and with the brackets mounted in place...
more good news is that we have the front cradle castings and the stub axles !!!
craig@STW- Number of posts : 1410
Location : location Location
Registration date : 2010-05-06
Similar topics
» 6" foden progress
» Foden Progress so far
» 6" foden progress
» Open day at our local Model Club
» 6"Foden progress
» Foden Progress so far
» 6" foden progress
» Open day at our local Model Club
» 6"Foden progress
Page 1 of 1
Permissions in this forum:
You cannot reply to topics in this forum