Post  craig@STW on Fri 06 Jul 2018, 3:57 pm

photos for this week...

the last stage of the Burrell / roller cylinder blocks is the fitting of the liners. here they are on the 4th axis mill...

July/August/September 2018 production photo HLTeByG

on the subject of cylinder blocks, i have just started a new batch on 2inch blocks. made out of solid, the first op has around 12 tools and takes about 47 mins each...

July/August/September 2018 production photo 62k9Ont

lots more wood done this week. this is the traction wagon kit 3...

July/August/September 2018 production photo L6n6LGe

July/August/September 2018 production photo 9iGuCPU

July/August/September 2018 production photo P4XQeh5

another job i've had to fit in around production. Burrell trigger levers...

July/August/September 2018 production photo Espqd99

boiler bushes...

July/August/September 2018 production photo F5B9qJi

and the very first, fully welded Roller Boiler...

July/August/September 2018 production photo K2nKSLY

and the second one. this one is still hot !!!

July/August/September 2018 production photo WwyYyZX
craig@STW
craig@STW

Number of posts : 1400
Location : location Location
Registration date : 2010-05-06

Back to top Go down

July/August/September 2018 production photo Empty Re: July/August/September 2018 production photo

Post  craig@STW on Fri 13 Jul 2018, 3:57 pm

some very quick last minute photos this week...

the new batch of 2inch cylinder blocks that i started last week are now onto their second op. so that's the front and rear faces and saddle done. then its onto the top and sides and finally it needs a 4th axis op for the saddle holes...

July/August/September 2018 production photo CIJFYE6

the 2inch cylinder liners are also done...

July/August/September 2018 production photo SvZ9nes

we still have one machine cutting wood for the wagon kits. these will be the main cross members...

July/August/September 2018 production photo 8UUgFxe

cutting out the clearance for the rear wheels...

July/August/September 2018 production photo APrL5U2

the pile of finished parts is slowly growing...

July/August/September 2018 production photo NqJeMfj

also have a couple of machines working on the main chassis for the bowser. these should only take a couple of days and then they are off for fabrication...

July/August/September 2018 production photo 5frtJTU

and finally boiler making. yes i know it all looks very similar but this is actually a stage i don't think we have seen before. here you can see the internal firebox being held in place with rods and spacers, ready for welding. (it would probably be a good idea to sort all these boiler pics into a logical order at some point and post them in their own topic)

July/August/September 2018 production photo OltBT9L
craig@STW
craig@STW

Number of posts : 1400
Location : location Location
Registration date : 2010-05-06

Back to top Go down

July/August/September 2018 production photo Empty Re: July/August/September 2018 production photo

Post  Mark the spark on Fri 20 Jul 2018, 2:24 pm

Hi Craig
Is there any news on the last two showmans kits I only ask as its coming up to one year since I had my last kit
Thanks Mark

Mark the spark

Number of posts : 314
Location : Edinburgh
Registration date : 2015-04-26

Back to top Go down

July/August/September 2018 production photo Empty July,August, September production

Post  Heavyhaul on Sun 22 Jul 2018, 8:53 am

Hi Mark,
I'm like yourself building the showman's engine and still waiting for the last two kits. I've even started a second showman's, would be nice to finish the first one before starting the second. Since Craig posted the pictures about the trials with the alternators there's been no further updates regarding whether the alternators will fit the original dynamo castings or not. I agree with yourself it's nearly a year since receiving my last kit. One thing I can't understand is why did they leave it until the nearly the end of the production, before they started looking at changing the motors.

Regards
Steve

Heavyhaul

Number of posts : 75
Age : 54
Location : Aylesbury, Buckinghamshire
Registration date : 2013-07-01

Back to top Go down

July/August/September 2018 production photo Empty Re: July/August/September 2018 production photo

Post  Mark the spark on Sun 22 Jul 2018, 9:23 am

Hi Steve
Quite agree

Mark the spark

Number of posts : 314
Location : Edinburgh
Registration date : 2015-04-26

Back to top Go down

July/August/September 2018 production photo Empty Re: July/August/September 2018 production photo

Post  craig@STW on Fri 27 Jul 2018, 3:56 pm

i just might also agree with you guys, but this is not the place for that particular question. i suggest a phone call may give you the answers ???

what can i tell you ?? well yes, the new parts are designed to fit the original castings. at the moment i believe we are looking at any modifications needed to those existing parts and then any adjustments and/or new parts will be made.

a few photos for this week.

brand new lyka boiler plates, around 250 holes per plate. holes are half inch. i have drilled two sets for a couple of "test boilers" to prove out the process...

July/August/September 2018 production photo 14Kcqgn

all traction wagon wood is done and the new batch of water cart kits were finished toady...

July/August/September 2018 production photo 1V4X1Xa

July/August/September 2018 production photo SN1icHK

the 2inch cylinder blocks are back on. working on the various steam ports...

July/August/September 2018 production photo MeMIT5e

and i have just started on some 2inch rear hubs...

July/August/September 2018 production photo ANw2enF

4inch fire door runners...

July/August/September 2018 production photo 3uZA7ke

on the lathe, 4inch Burrell con rods...

July/August/September 2018 production photo VM4wgpR

and boilers. this week they are being tubed...

July/August/September 2018 production photo SWafSNz
craig@STW
craig@STW

Number of posts : 1400
Location : location Location
Registration date : 2010-05-06

Back to top Go down

July/August/September 2018 production photo Empty Re: July/August/September 2018 production photo

Post  craig@STW on Fri 03 Aug 2018, 4:04 pm

this weeks photos...

the 2inch cylinder blocks are on their last op. this is the 4th axis op with the saddle holes and any other holes that are at a "strange" angle...

July/August/September 2018 production photo K9dlV18

July/August/September 2018 production photo ULsHmnq

2inch rear hub halves are all done. we just need to turn the tubes that hold them together...

July/August/September 2018 production photo LrPPSTU

July/August/September 2018 production photo ECMz86K

the BU4 con-rods are still on. these take around an hour each to turn !!!

July/August/September 2018 production photo KNDXOVY

and im making the bearing straps and will be starting on the bearings next week...

July/August/September 2018 production photo UiNyXk5

showmans draw bolts...

July/August/September 2018 production photo M9asBru

boilers still being tubed...

July/August/September 2018 production photo Hui8HDh

and Harry installing another fire box...

July/August/September 2018 production photo AGgcciU

July/August/September 2018 production photo 442CeTq
craig@STW
craig@STW

Number of posts : 1400
Location : location Location
Registration date : 2010-05-06

Back to top Go down

July/August/September 2018 production photo Empty Re: July/August/September 2018 production photo

Post  craig@STW on Fri 10 Aug 2018, 4:06 pm

just to confirm that Ian is currently working on the new showmans generator kits, working out how to make the new parts work with the old kit. progress is slow but it is happening...slowly !!!

this weeks photos...

the next batch of boilers are onto the final machining stage...

July/August/September 2018 production photo Z8YH2Om

the 4inch burrell/road loco and 2inch cylinder blocks have now had their liners fitted...

July/August/September 2018 production photo Qad4Hib

July/August/September 2018 production photo PdVNOW6

and the 2inch pistons are on the lathes...

July/August/September 2018 production photo ZjA0loP

and 2inch steam chest covers...

July/August/September 2018 production photo Lbcczzp

2inch piston glands...

July/August/September 2018 production photo RzclA2A

July/August/September 2018 production photo 4SazJcL

4inch burrell con-rod bearings are now on the 4th axis machine...

July/August/September 2018 production photo WjGIcay

this allows me to cut all the important slots in one operation...

July/August/September 2018 production photo 2HO3tL8

and from the fabrication area, some 4inch gear guards...

July/August/September 2018 production photo P2KBN1Y
craig@STW
craig@STW

Number of posts : 1400
Location : location Location
Registration date : 2010-05-06

Back to top Go down

July/August/September 2018 production photo Empty Re: July/August/September 2018 production photo

Post  Mark the spark on Mon 20 Aug 2018, 10:47 am

Hi All
Can I ask if the new generators will be AC or DC as I am thinking of fitting leds
Mark

Mark the spark

Number of posts : 314
Location : Edinburgh
Registration date : 2015-04-26

Back to top Go down

July/August/September 2018 production photo Empty Re: July/August/September 2018 production photo

Post  Goliewogs on Sat 25 Aug 2018, 8:57 am

Whats happened to the weekly production update? It's now been two weeks with no news - most unusual. I hope all is well at STW.
Greg

Goliewogs

Number of posts : 65
Age : 68
Location : FRANCE - Normandie
Registration date : 2016-03-28

Back to top Go down

July/August/September 2018 production photo Empty Re: July/August/September 2018 production photo

Post  Mark the spark on Sat 25 Aug 2018, 9:31 am

They will all be at GDSF

Mark the spark

Number of posts : 314
Location : Edinburgh
Registration date : 2015-04-26

Back to top Go down

July/August/September 2018 production photo Empty Re: July/August/September 2018 production photo

Post  craig@STW on Fri 07 Sep 2018, 4:12 pm

yes sorry, have missed a few weeks again, mainly due to dorset, holidays and other things going on.

here are some photos from this week.

the mini lyka test boiler was a success...

July/August/September 2018 production photo ApjTY7Q

so the full size barrels are being weld prepped...

July/August/September 2018 production photo YHYyjhR

and the first proto-type full size test boiler is welded up...

July/August/September 2018 production photo Sla2geH

on the machines this week we have BU4 lifting arms...

July/August/September 2018 production photo ZD61tK9

July/August/September 2018 production photo Eprqseh

and finishing the BU4 con rods...

July/August/September 2018 production photo IxPhTiK

grate bars...

July/August/September 2018 production photo FAxZHn2

gears...

July/August/September 2018 production photo KaLSly0

6inch foden Brake wheels are now here and nearly done...

July/August/September 2018 production photo WV6QaW8

Lyka engine parts...

July/August/September 2018 production photo 6gjKI9O

July/August/September 2018 production photo YcCBOpW

most of which is on the shelf already...

July/August/September 2018 production photo Zni1Oxk

craig@STW
craig@STW

Number of posts : 1400
Location : location Location
Registration date : 2010-05-06

Back to top Go down

July/August/September 2018 production photo Empty Re: July/August/September 2018 production photo

Post  Mark the spark on Mon 10 Sep 2018, 9:23 pm

Hi Craig
Is there any update on showmans kits 34/35
Mark

Mark the spark

Number of posts : 314
Location : Edinburgh
Registration date : 2015-04-26

Back to top Go down

July/August/September 2018 production photo Empty Re: July/August/September 2018 production photo

Post  craig@STW on Fri 14 Sep 2018, 3:56 pm

no, no more on the last two kits at the moment Crying or Very sad

this weeks theme on the machines is making large batches from solid blocks, first off, BU4 weigh-shaft levers...

July/August/September 2018 production photo QtmYSKf

July/August/September 2018 production photo Cvm57XD

diff lock rings...

July/August/September 2018 production photo HMGV6KF

and pump eccentrics...

July/August/September 2018 production photo VrVxnYS

6inch foden gear change yokes...

July/August/September 2018 production photo XTrmc8i

and safety valve chimneys...

July/August/September 2018 production photo H3P3CmA

BU4 cladding...

July/August/September 2018 production photo USQbCr1

and the boiler bands for the new lyka boilers...

July/August/September 2018 production photo Id0uAbn
craig@STW
craig@STW

Number of posts : 1400
Location : location Location
Registration date : 2010-05-06

Back to top Go down

July/August/September 2018 production photo Empty Re: July/August/September 2018 production photo

Post  the governer on Tue 18 Sep 2018, 10:24 pm

Craig, on 13th July, you posted pictures of wagon wood being machined, can you please update where this now stands, as we haven't had a kit.

Thanks,

Mark.
the governer
the governer

Number of posts : 67
Age : 63
Location : dorset
Registration date : 2013-10-06

Back to top Go down

July/August/September 2018 production photo Empty Re: July/August/September 2018 production photo

Post  sonick45 on Wed 19 Sep 2018, 5:42 am

the governer wrote:Craig, on 13th July, you posted pictures of wagon wood being machined, can you please update where this now stands, as we haven't had a kit.

Thanks,

Mark.


Mark are you building the Traction Wagon or Agricultural?

sonick45

Number of posts : 509
Location : Barton-Le-Clay (Beds)
Registration date : 2009-01-26

Back to top Go down

July/August/September 2018 production photo Empty Re: July/August/September 2018 production photo

Post  the governer on Wed 19 Sep 2018, 7:35 am

Building the agri.
the governer
the governer

Number of posts : 67
Age : 63
Location : dorset
Registration date : 2013-10-06

Back to top Go down

July/August/September 2018 production photo Empty Re: July/August/September 2018 production photo

Post  LazySmurfer on Fri 21 Sep 2018, 6:39 pm

I phoned the other day the pics on here are for the Traction Wagons & they are still waiting for the wood for the Agricultural ones
LazySmurfer
LazySmurfer

Number of posts : 74
Age : 52
Location : Potton Bedfordshire
Registration date : 2016-10-21

Back to top Go down

July/August/September 2018 production photo Empty Re: July/August/September 2018 production photo

Post  craig@STW on Fri 28 Sep 2018, 3:49 pm

yes, i can confirm that. the wood for the agricultural wagons should be with us soon.
craig@STW
craig@STW

Number of posts : 1400
Location : location Location
Registration date : 2010-05-06

Back to top Go down

July/August/September 2018 production photo Empty Re: July/August/September 2018 production photo

Post  craig@STW on Fri 28 Sep 2018, 4:05 pm

this weeks photos !!! yes i have managed to find some time this week.

the main point of interest this week is the progress on the Lyka boilers. the final hole sizes have been decided and the plates are now on the mill for drilling...

July/August/September 2018 production photo Qhgvf8C

the number of holes per plate means progress is slow, but im slowly getting through them...

July/August/September 2018 production photo JZkTzMt

and work continues on the 1st off test boiler, with the tubes now being fitted...

July/August/September 2018 production photo Wf7AbO3

other jobs on the machines this week include road loco boiler barrels...

July/August/September 2018 production photo TZDa06Y

July/August/September 2018 production photo UmnTona

BU4 weigh-shaft brakets...

July/August/September 2018 production photo 3i7J0QT

and lifting arms for both BU4 and showmans/road loco...

July/August/September 2018 production photo ZwkZu7l

the manual section have been working on the roller cladding...

July/August/September 2018 production photo 3fOtnYA

and 4inch safety valves...

July/August/September 2018 production photo PIDHwcH

BU4 con rods ready to go...

July/August/September 2018 production photo 5OHlWkG

the final Lyka engine kit is all done and ready to go next week...

July/August/September 2018 production photo OgsNaBp

also going next week is Foden 6inch kit 23...

July/August/September 2018 production photo HcSJhUP
craig@STW
craig@STW

Number of posts : 1400
Location : location Location
Registration date : 2010-05-06

Back to top Go down

July/August/September 2018 production photo Empty Re: July/August/September 2018 production photo

Post  sonick45 on Wed 17 Oct 2018, 5:37 pm

craig@STW wrote:yes, i can confirm that. the wood for the agricultural wagons should be with us soon.

any update Craig?

Cheers
Nick

sonick45

Number of posts : 509
Location : Barton-Le-Clay (Beds)
Registration date : 2009-01-26

Back to top Go down

July/August/September 2018 production photo Empty Re: July/August/September 2018 production photo

Post  Sponsored content


Sponsored content


Back to top Go down

Back to top


 
Permissions in this forum:
You cannot reply to topics in this forum